Opening & Closing
Start-of-day and end-of-day readiness for Wuse 2 Supermarket.
Opening completion
5/6
Midday
3/4
Closing
0/6
Failed checks
3
Opening Checklist
- Doors unlocked & alarm off
- POS lanes booted
- Float cash confirmed
- Fridge / freezer temps logged
- Perishables inspection
- Staff sign-in
Midday Checklist
- Shelf restock pass
- Price audit sample
- Cash drop 1 to safe
- Complaint log review
Closing Checklist
- Cash reconciliation
- POS end-of-day
- Freezer lock check
- Waste log
- Alarm arm
- Manager sign-off
Opening Float Confirmation
L-01 Amaka N.₦100,000Confirmed
L-02 Tunde B.₦100,000Confirmed
L-03 Grace O.₦100,000Confirmed
L-04 Segun A.₦100,000Confirmed
L-05 Halima I.₦100,000Confirmed
Systems Status
POS Boot
5/5 onlineOK
Alarm system
DisarmedOK
CCTV
16/16 liveOK
Generator
Backup, on standbyOK
Fridge temp
3.2°C avgOK
Freezer temp
-16°C (drift)OK
End-of-Day Readiness
50%
ready
Opening100%
Midday75%
Closing0%
Manager Sign-off
Manager: Adaeze Okoye
Date: 2026-07-05
Shift: Shift 2